PROJECT DESCRIPTION:
-
Power Plant (660MW): 4x110 GT + 4x300 T/H + 2x110 ST
-
MSF: 5 x12.5 = 62.5 MIGD
-
R.O Plant: 37.5 MIGD
SCOPE OF WORK:
-
Mechanical、Electrical and Instrumentation Works including detailed design for piping system.
-
Partial supply M&E installation.
-
Testing and commissioning work of Reverse Osmosis Plant.
CLIENT:Abu Dhabi Water and Electricy Authority LOCATION: Fujairah, UAE
DURATION:2002-2003