TYPICAL PROJECT
Hengdong Electronic Zone Utility Plant


 

PROJECT DESCRIPTION


SCOPE OF WORK

  • Engineering Design, Procurement, Construction and Commissioning of 2 x 75 ton Boiler and Heating System.
  • Demolishing the existing coal fired boiler and associated system.


CLIENT: Beijing Zhengdong Group             LOCATION: Beijing, China


DURATION: 2009-2011


  • Next:Pulau Seraya 2 x 370 MW Combined Cycle Power Plant