PROJECT DESCRIPTION:
SCOPE OF WORK:
-
Engineering Design, Procurement, Construction and Commissioning of 2 x 75 ton Boiler and Heating System.
-
Demolishing the existing coal fired boiler and associated system.
CLIENT: Beijing Zhengdong Group LOCATION: Beijing, China
DURATION: 2009-2011