PROJECT DESCRIPTION:
-
Fabrication, blasting and painting, transportation of 6 wind-box 1070MW Supercritical Pulverized Coal-Fired Power Plant Project in Taketoyo,Japan
-
Q’ty: 6 nos; Weight 65tons/per bunker, Total 452tons.
-
Size: L30mxW10mxH2.4m.
SCOPE OF WORK:
-
Preparing shop fabrication drawing
-
Marking and welding
-
Surface preparation and shop painting
-
Modelling
-
Inspection
-
Export packing, domestic transportation
CLIENT: Mitsubishi Heavy Industries. Ltd. LOCATION: Taketoyo, Japan
DURATION: Apr 2019 to Nov 2019