PROJECT DESCRIPTION:
-
Fabrication, blasting and painting, transportation, Loading and ship lashing of 6 coal bunkers with internal stainless steel liner for 1070MW Supercritical Power Plant in Taketoyo, Aichi Japan.
-
Q’ty: 6 nos; Inner diameter: 10.9m; Total height 34.9m; Weight 147tons/per bunker, Total 895tons.
-
Whole bunker is lined with 3mm stainless steel plate by sealing welding.
-
One bunker is divided into 3 blocks, which is modeling at port assembly yard. Block 1: 40tons with 7m height; Block 2: 35tons with 9m height; Block 3: 72tons with 18.5m height
Scope of Work:
-
Preparing shop fabrication drawing
-
Marking and welding
-
Surface preparation and shop painting
-
Modelling
-
Inspection
-
Export packing, domestic transportation
-
Loading onto the shipment and lashing
CLIENT:Mitsubishi Heavy Industries. Ltd. LOCATION: Taketoyo, Aichi, Japan
DURATION: Oct 2018 -Aug 2019